Construction Technologies
PILLAR was established as a subsidiary of Dorra contracting in 2017, as an agent of OVM Post-Tensioning Systems in Egypt and North Africa.
Design, Supply, Installation, Supervision of Post tensioning services in the following disciplines:
- Pre-stressed concrete flat slabs.
- Pre-stressed concrete slab on grade.
- Pre-stressed concrete multi strands system.
- Pre-stressed concrete for Silos construction.